Bates College First to Implement Campus-Wide “Green-Up” Project with Cut ‘n Wrap

BATES 2015 FINAL_Page_1Bates College in Lewiston, Maine recently installed AMI’s EverGreen® Cut ‘n Wrap™ removable/reusable insulation system on 500 hot pipe components in 18 mechanical rooms utilizing AMI’s Green Up contracting services. The energy savings and reduction of GHG emissions were immediate and substantial.  Job was completed in 2 weeks.  15 month payback. $34,000/yr in energy savings.

Download the Case Study